Iranian Classification Society Rules

Next >


image

2015


image


Guidance for


Floating Production Units


image



 

GC-11-EAPPLICATION OF1. Unless expressly specified otherwise, the requirements in the Guidance apply to Floating Production Units for which contracts for construction are signed on or after 7 July 2015.CONTENTSCHAPTER 1 GENERALSection 1 GeneralSection 2 DefinitionCHAPTER 2 CLASSIFICATION AND SURVEYSSection 1 GeneralSection 2 ClassificationSection 3 SurveysCHAPTER 3 DESIGN CONDITIONSSection 1 GeneralSection 2 Design PrinciplesSection 3Section 4 Design LoadsCHAPTER 4 MATERIALS AND WELDINGSection 1 GeneralCHAPTER 5 HULL CONSTRUCTION AND EQUIPMENTSection 1 GeneralSection 2 StabilitySection 3 Longitudinal StrengthSection 4 Structural Design and Analysis of the HullSection 5 Design and Analysis of Other Major Hull Structural FeaturesSection 6 Structural Strength for Column-stabilized and Other Type UnitsSection 7 Hull EquipmentCHAPTER 6 POSITIONING SYSTEMSSection 1 GeneralSection 2 Mooring AnalysisSection3 Design of Mooring Lines, etc.Section 4 Mooring EquipmentSection 5 Single Point Mooring SystemsSection 6 Anchor Holding PowerSection 7 Dynamic Positioning SystemsCHAPTER 7 HAZARDOUS AREASection 1 GeneralSection 2 Extent of Hazardous AreaSection 3 VentilationCHAPTER 8 FIRE PROTECTION, MEANS OF ESCAPE AND FIRE EXTINCTIONSection 1 GeneralSection 2 Prevention of Fire and ExplosionSection 3 Suppression of FireSection 4 Means of EscapeCHAPTER 9 MACHINERY INSTALLATIONSSection 1 GeneralSection 2 Piping Systems for Crude Oil TanksSection 3 Use of Produced Gas as FuelSection 4 Boilers Using Crude OilCHAPTER 10 ELECTRICAL EQUIPMENT AND CONTROL SYSTEMSSection 1 Electrical EquipmentSection 2 Control SystemsCHAPTER 11 PRODUCTION AND PROCESS SYSTEMSSection 1 General13. Shut-in condition A condition resulting from the shutting-in of the facility which is caused by the occurrence of one or more undesirable events.Section 2 Design of Process SystemsSection 3 Process System EquipmentSection 4 Process Support SystemsCHAPTER 12 IMPORT AND EXPORT SYSTEMSSection 1 GeneralSection 2 DesignGUIDANCE FOR FLOATING PRODUCTION UNITS